• Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
  • Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
  • Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
  • Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
  • Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
  • Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

After-sales Service: Yes
Warranty: Yes
Type: C Channel, U Channel, Wall Angle, Furring
Standard: GB
Shape: C Channel
Perforated: Perforated
Customization:
Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
Metal Stud
Length
3000mm
Material
Galvanized Sheet,Galvanized Steel
Zine Coted
GB:80g--275g; ASTM:G60-G90
Height
25/30/32/35/40mm
Width
50/65/70/90/100mm
Thickness
0.45~1.0mm
Function
Fireproof, Waterproof, Rustproof, Heat Insulation,
Application
Partition and Ceiling System
Certificate
ISO,Ce,Ucs,Iaf,CNAS
Transport Package
Bundle Packing: 10PCS/Bundle or 20PCS/Bundle
Trademark
TITAN
Origin
China
HS Code
7216910000
Production Capacity
300000 Piece/Pieces / Month

Product Description

Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
Main Characteristic
1.Galvanized Zinc coating will protect the channel from being rust; 

2.Flexibility of application makes each ceiling tile/plasterboard easily installed anddisconnected;
3.Size adjustability can easier to match your request;
4.High quality leads longer life span & higher strength;
5.Better function of dealing with both high tensile stress and blending stress.
6. Easy and fast for installation,time-saving. 


Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
Hot Dipped Galvanized Metal Stud and Track Drywall Metal StudHot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

Partition Installing Method

 

1. Galvanized Metal Frame

a.The top and bottom keels are fixed respectively top floor and on floor with expansion bolts.

b.The vertical keel should be aligned well according to the requirement (generally being 612 mm) with

laterally supporting keel installed.

 

2. Board Material Package Fixed

a.Cutting the board material to the dimensions needed (about 10mm lower than wall height)

b.Board material is fixed on keel in anchoring seam way with tapping screw: the interval of tapping screw is generally

about 200~250mm with screws sinking 0.5mm under the board face.

c.The expansion seam of about 4mm between boards should be kept.

d.The shrouding should be fixed from the middle to the four sides and cannot be operated at multipoint simultaneously

to avoid generating inner stress to make board material bucking.

e.Before board being packaged and fixed, depending the needs, glass cotton or rock cotton can be filled.

Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

Ceiling Installing Method

 

1.Carry out ceiling line-measuring to determine the ceiling's fixed position, the boom's central range is generally 1200.

2.Connect and fix the boom and main keel with hanging piece to make the main keel keep level position.

3.Vertically fix the sub-keel to the main keel with hanging piece; the sub-keel axis'central range is 612mm.

4.Install the laterally supporting keel properly, its central ranges is 1224mm.

5.Fix the board on sub-keels with tapping screws, and to well the seam-connecting treatment.

 

Notice:

The hanging system of TITAN board combined with light steel keel is divided into two kinds of person-standing type

and non person-standing type; for the non person-standing type,only consider the self-weight of ceiling and light.Lamp

 

without loading other loads; for the person-standing type. Consider about 80~100kg load when someone repaired it.

Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

 

Ceiling System Proportion

Gypsum Board  1200×2400×9mm

1 m2

Main Runner

1 m

Cross Runner

3~3.6 m

Hanger

2~3 pcs

Main Runner Connector

0.5 pcs

Cross Runner Connector

1 pcs

Leveling

4~6 pcs

Sleeve Anchor

1 set

Cross Screw

1 set

Drywall Self Tapping Screw

25~30 pcs

Paper Joint Tape / Mesh Joint Tape

1.5~2 m

Partition System Proportion

Gypsum Board  1200×2400×12mm

2 m2

Metal Stud

2.2~3.6 m

Metal Track

0.7~1.4 m

Intermediate Channel

0.8~1.4 m

Support Card

4 pcs

Drywall Self Tapping Screw

25~30 pcs

Paper Joint Tape / Mesh Joint Tape

1.5~2 m


Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud
Hot Dipped Galvanized Metal Stud and Track Drywall Metal Stud

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2016

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
1000000 RMB
Plant Area
>2000 square meters